Skip to main navigation Skip to search Skip to main content

Daily Control System for the Construction of Multi-family Building Projects

  • Universidad Peruana de Ciencias Aplicadas

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Scopus citations

Abstract

Construction projects for buildings, in the execution stage, show a variation of the real with respect to what is planned in the budget. The consequence of this lag presented usually causes large economic losses. Given this situation, in the construction industry, various control systems have been developed that have as a final deliverable a frequent management report, which serves to make decisions regarding the analyzed, whose results are applied and evaluated after a specific period of time. These management reports have good results at the time of their application; however, data processing, analysis execution, and decision making take approximately 30 days. In this sense, the present investigation proposes to develop a control system focused in real time, generated by the daily control in the execution stage. The results show a reduction of waste in the main resources of multi-family building projects, and this is in labor and materials, identifying the causes that originate them and suggesting generic solutions, at the end of the workday.

Original languageEnglish
Title of host publicationProceedings of the 5th Brazilian Technology Symposium - Emerging Trends, Issues, and Challenges in the Brazilian Technology
EditorsYuzo Iano, Rangel Arthur, Osamu Saotome, Guillermo Kemper, Reinaldo Padilha França
PublisherSpringer Science and Business Media Deutschland GmbH
Pages617-627
Number of pages11
ISBN (Print)9783030575472
DOIs
StatePublished - 2021
Event5th Brazilian Technology Symposium, BTSym 2019 - Campinas, Brazil
Duration: 22 Oct 201924 Oct 2019

Publication series

NameSmart Innovation, Systems and Technologies
Volume201
ISSN (Print)2190-3018
ISSN (Electronic)2190-3026

Conference

Conference5th Brazilian Technology Symposium, BTSym 2019
Country/TerritoryBrazil
CityCampinas
Period22/10/1924/10/19

Keywords

  • Building projects
  • Cost reduction variability
  • Management

Fingerprint

Dive into the research topics of 'Daily Control System for the Construction of Multi-family Building Projects'. Together they form a unique fingerprint.

Cite this