Abstract
The jewelry industry, as one of the key subsectors within the manufacturing sector, plays a vital role in economic growth, representing 17% of the country's development. However, it faces an efficiency problem in the production process, mainly caused by unplanned machine downtime. This was evident in a jewelry manufacturing company, where the most crucial productivity factor was identified, and the DMAIC method was proposed to improve the company's efficiency. In order to achieve this, an implementation proposal based on two fundamental tools has been developed: the Plan-Do-Check-Act (PDCA) Cycle and the 5S. These tools were carefully selected due to their proven effectiveness in process optimization and reducing unplanned failures. The model was validated in a company dedicated to the supply and maintenance of dry chemical powder extinguishers in Apurímac. The results are remarkable: availability increased from 76% to 93%, performance from 39% to 95%, and quality from 43% to 95%. Efficiency also improved significantly, from 13% to 84%, demonstrating the effectiveness of the proposal. The main outcome of this research is the improvement in efficiency, directly contributing to the growth of the industry and, ultimately, the economic development of the country. This research provides an effective solution to address the low efficiency problem in the jewelry industry, demonstrating that the implementation of PDCA and 5S tools can lead to significant efficiency improvements.
| Original language | English |
|---|---|
| Title of host publication | Proceedings of the 22nd LACCEI International Multi-Conference for Engineering, Education and Technology |
| Subtitle of host publication | Sustainable Engineering for a Diverse, Equitable, and Inclusive Future at the Service of Education, Research, and Industry for a Society 5.0., LACCEI 2024 |
| Publisher | Latin American and Caribbean Consortium of Engineering Institutions |
| ISBN (Electronic) | 9786289520781 |
| DOIs | |
| State | Published - 2024 |
| Event | 22nd LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2024 - Hybrid, San Jose, Costa Rica Duration: 17 Jul 2024 → 19 Jul 2024 |
Publication series
| Name | Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology |
|---|---|
| ISSN (Electronic) | 2414-6390 |
Conference
| Conference | 22nd LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2024 |
|---|---|
| Country/Territory | Costa Rica |
| City | Hybrid, San Jose |
| Period | 17/07/24 → 19/07/24 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 8 Decent Work and Economic Growth
Keywords
- Efficiency
- industry
- jewelry continuous improvement
- machines
- production
Fingerprint
Dive into the research topics of 'Implementation of productivity improvements in gold chains through the PDCA and 5S cycles in a jewelry company in Peru'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver