Skip to main navigation Skip to search Skip to main content

Lean Maintenance Management Model, Based on TPM and 5S to Increase the Availability of Machines in the Plastics Industry

  • Universidad Peruana de Ciencias Aplicadas

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Scopus citations

Abstract

In a production system in the plastics industry, the implementation of the Lean Manufacturing tool is carried out with a view to reducing machine downtime, because there is a relatively low availability rate, which is generated by breakdowns constant and prolonged time in its restoration. With the application of the Total Productive Maintenance technique focused on the criticality analysis of modes, effects and failures. It seeks to reduce the six major losses of equipment, through the timely identification of the main causes of unforeseen breakdowns, which affects the availability of machines and their productivity and increases production costs. The Solution model will be implemented in three of these: First, the preparation stage. Then, the implementation stage that consists of the development of two methodology that is Total Productive Maintenance and 5S. Finally, the monitoring stage that allows the indicators to be compared with the improved line.

Original languageEnglish
Title of host publicationHuman Interaction, Emerging Technologies and Future Systems V - Proceedings of the 5th International Virtual Conference on Human Interaction and Emerging Technologies, IHIET 2021 and the 6th IHIET
Subtitle of host publicationFuture Systems IHIET-FS 2021
EditorsTareq Ahram, Redha Taiar
PublisherSpringer Science and Business Media Deutschland GmbH
Pages410-416
Number of pages7
ISBN (Print)9783030855390
DOIs
StatePublished - 2022
Event5th International Virtual Conference on Human Interaction and Emerging Technologies, IHIET 2021 and 6th International Conference on Human Interaction and Emerging Technologies: Future Systems, IHIET-FS 2021 - Virtual, Online
Duration: 27 Aug 202129 Aug 2021

Publication series

NameLecture Notes in Networks and Systems
Volume319
ISSN (Print)2367-3370
ISSN (Electronic)2367-3389

Conference

Conference5th International Virtual Conference on Human Interaction and Emerging Technologies, IHIET 2021 and 6th International Conference on Human Interaction and Emerging Technologies: Future Systems, IHIET-FS 2021
CityVirtual, Online
Period27/08/2129/08/21

Keywords

  • 5S
  • Availability
  • Lean manufacturing
  • Total productive maintenance (TPM)

Fingerprint

Dive into the research topics of 'Lean Maintenance Management Model, Based on TPM and 5S to Increase the Availability of Machines in the Plastics Industry'. Together they form a unique fingerprint.

Cite this