Currently, small- and medium-sized enterprises face order fulfillment issues, thus generating reduced service levels. In addition, these companies are usually not aware of the importance of continuous improvement tools or of training staff as a mitigation strategy for this situation. Within this framework, the authors performed a literature review to compile production models through which downtimes could be reduced. The production model designed therefrom comprises Lean Manufacturing and work study tools within a Change Management approach. This design focuses on model implementation by small companies without requiring large investment, cutting-edge technology, or qualified personnel. Finally, an application case study was conducted in a small textile manufacturing company located at the Gamarra Fashion Center in Lima, Peru. The results that were reported revealed that late order fulfillment instances reduced by up to 18%, which had an impact on downtimes, unnecessary movements, and in-process inventory levels, thus increasing productivity by 85%.

Original languageEnglish
Article number012023
JournalIOP Conference Series: Materials Science and Engineering
Volume796
Issue number1
DOIs
StatePublished - 6 Apr 2020
Event9th Annual International Conference 2019 on Sciences and Engineering, AIC-SE 2019 - Banda Aceh, Indonesia
Duration: 18 Sep 201920 Sep 2019

Fingerprint

Dive into the research topics of 'Lean production management model under the change management approach to reduce order fulfillment times for Peruvian textile SMEs'. Together they form a unique fingerprint.

Cite this