Skip to main navigation Skip to search Skip to main content

Production Management Model Based on Lean Manufacturing and Change Management Aimed at Reducing Order Fulfillment Times in Micro and Small Wooden Furniture Companies in Peru

  • Universidad Peruana de Ciencias Aplicadas
  • Universidad Rey Juan Carlos

Research output: Contribution to journalConference articlepeer-review

3 Scopus citations

Abstract

This research study seeks to identify and prioritize the causes of order fulfillment delays in a small wooden furniture manufacturing company. The authors propose a 5-phase Lean Optimization model to address and reduce this problem. Post-implementation results yielded a 54.87% reduction in material search and transportation times, a 32.86% reduction in travel times between stations, and a 19.81% increase in line efficiency. In addition, order fulfillment percentages increased from 12.5% to 60%.

Original languageEnglish
Article number012022
JournalIOP Conference Series: Materials Science and Engineering
Volume796
Issue number1
DOIs
StatePublished - 6 Apr 2020
Event9th Annual International Conference 2019 on Sciences and Engineering, AIC-SE 2019 - Banda Aceh, Indonesia
Duration: 18 Sep 201920 Sep 2019

Fingerprint

Dive into the research topics of 'Production Management Model Based on Lean Manufacturing and Change Management Aimed at Reducing Order Fulfillment Times in Micro and Small Wooden Furniture Companies in Peru'. Together they form a unique fingerprint.

Cite this