Abstract

The paint industry at the SME level concentrates on various critical processes in the production process. This is due to the lack of planning and engineering support systems, which result in issues such as low on-time delivery rates, defective products, stockouts, and others. In this context, a case study is presented, which is 24% below the standard for on-time deliveries. To address this issue, a production model based on Standard Work and Raw Material Management is proposed for a paint SME in Peru. The diagnosis is carried out through a time and activity analysis that encompasses paint manufacturing, as well as the analysis of production stops due to raw material shortages. The model will be implemented through a hybrid approach that combines implementation and simulation. Through this approach, the production cycle time is optimized by 33.6% (from 301.13 minutes to 225.39 minutes), and therefore, the production capacity is increased by 13.51% (from 1377 gallons/shift to 1563 gallons/shift). Additionally, stockouts are reduced from 6.52% to 0.22%, and On-Time Delivery (OTD) rates improve by 17.85%.

Translated title of the contributionReducción de los tiempos de entrega de pedidos en Mypes de pinturas basado en Standard Work y Gestión de la materia prima
Original languageEnglish
Title of host publicationProceedings of the 21st LACCEI International Multi-Conference for Engineering, Education and Technology
Subtitle of host publicationLeadership in Education and Innovation in Engineering in the Framework of Global Transformations: Integration and Alliances for Integral Development, LACCEI 2023
EditorsMaria M. Larrondo Petrie, Jose Texier, Rodolfo Andres Rivas Matta
PublisherLatin American and Caribbean Consortium of Engineering Institutions
ISBN (Electronic)9786289520743
StatePublished - 2023
Event21st LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2023 - Buenos Aires, Argentina
Duration: 19 Jul 202321 Jul 2023

Publication series

NameProceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
Volume2023-July
ISSN (Electronic)2414-6390

Conference

Conference21st LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2023
Country/TerritoryArgentina
CityBuenos Aires
Period19/07/2321/07/23

Keywords

  • lean manufacturing
  • on-time delivery
  • paint manufacturing
  • raw material management
  • standard work