Skip to main navigation Skip to search Skip to main content

Reduction of delivery times in a Peruvian metal-mechanical company

  • Universidad Peruana de Ciencias Aplicadas

Research output: Contribution to journalArticlepeer-review

4 Scopus citations

Abstract

This study seeks to achieve the highest level of service and productivity in an industry in the metal-mechanical sector. For this, observations, a study of methods and times were carried out to investigate the limiting factors of the progression of productivity in an environment of manufacture of electrical panels. The captured data was used to identify the different wastes present in the production system, suggest, and validate sustainable manufacturing system strategies using a system simulation model. The proposed solution used for this research incorporates lean thinking and its tools such as the value flow map (VSM), the theory of constraints (TOCs), 5S, the Kanban production system, and the standardisation of working methods. The implementation of the proposed methodology resulted in the improvement of the general performance of the company under study with a 15.74% reduction in cycle time.

Original languageEnglish
Pages (from-to)266-293
Number of pages28
JournalInternational Journal of Six Sigma and Competitive Advantage
Volume12
Issue number2-3
DOIs
StatePublished - 2020

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure

Keywords

  • 5S
  • Continuous improvement
  • Kanban
  • Lean manufacturing
  • Make to order
  • MTO
  • On-time delivery
  • OTD
  • Work standardisation method

Fingerprint

Dive into the research topics of 'Reduction of delivery times in a Peruvian metal-mechanical company'. Together they form a unique fingerprint.

Cite this