T1 - Daily Control System for the Construction of Multi-family Building Projects
AU - Fernandez, Diego
AU - Zamora, Yeffry
AU - Rodriguez, Sandra
AU - Vilcapoma, Jorge
N1 - Publisher Copyright:
© 2021, Springer Nature Switzerland AG.
PY - 2021
Y1 - 2021
N2 - Construction projects for buildings, in the execution stage, show a variation of the real with respect to what is planned in the budget. The consequence of this lag presented usually causes large economic losses. Given this situation, in the construction industry, various control systems have been developed that have as a final deliverable a frequent management report, which serves to make decisions regarding the analyzed, whose results are applied and evaluated after a specific period of time. These management reports have good results at the time of their application; however, data processing, analysis execution, and decision making take approximately 30 days. In this sense, the present investigation proposes to develop a control system focused in real time, generated by the daily control in the execution stage. The results show a reduction of waste in the main resources of multi-family building projects, and this is in labor and materials, identifying the causes that originate them and suggesting generic solutions, at the end of the workday.
AB - Construction projects for buildings, in the execution stage, show a variation of the real with respect to what is planned in the budget. The consequence of this lag presented usually causes large economic losses. Given this situation, in the construction industry, various control systems have been developed that have as a final deliverable a frequent management report, which serves to make decisions regarding the analyzed, whose results are applied and evaluated after a specific period of time. These management reports have good results at the time of their application; however, data processing, analysis execution, and decision making take approximately 30 days. In this sense, the present investigation proposes to develop a control system focused in real time, generated by the daily control in the execution stage. The results show a reduction of waste in the main resources of multi-family building projects, and this is in labor and materials, identifying the causes that originate them and suggesting generic solutions, at the end of the workday.
KW - Building projects
KW - Cost reduction variability
KW - Management
UR - https://www.scopus.com/pages/publications/85098120291
U2 - 10.1007/978-3-030-57548-9_59
DO - 10.1007/978-3-030-57548-9_59
M3 - Contribución a la conferencia
AN - SCOPUS:85098120291
SN - 9783030575472
T3 - Smart Innovation, Systems and Technologies
SP - 617
EP - 627
BT - Proceedings of the 5th Brazilian Technology Symposium - Emerging Trends, Issues, and Challenges in the Brazilian Technology
A2 - Iano, Yuzo
A2 - Arthur, Rangel
A2 - Saotome, Osamu
A2 - Kemper, Guillermo
A2 - Padilha França, Reinaldo
PB - Springer Science and Business Media Deutschland GmbH
T2 - 5th Brazilian Technology Symposium, BTSym 2019
Y2 - 22 October 2019 through 24 October 2019
ER -