TY - GEN
T1 - Digital Transformation Model for the Reduction of Time Taken for Document Management with a Technology Adoption Approach for Construction SMEs
AU - Lazaro-Aleman, Waldir
AU - Manrique-Galdos, Fernando
AU - Ramirez-Valdivia, Cesar
AU - Raymundo-Ibañez, Carlos
AU - Moguerza, Javier M.
N1 - Publisher Copyright:
© 2020 IEEE.
PY - 2020/2
Y1 - 2020/2
N2 - Currently, the lack of time and cost optimization in processes is a factor that affects 65% of companies in the construction sector as they continue to use traditional methods for several company processes, such as document processing. Therefore, the contribution of this research is the reduction of document approval time for the parties involved by 75% through the digital transformation of medium-sized companies in the construction sector using the building information modeling (BIM) methodology, applying three stages: planning, where the context of the company is analyzed and initial data are obtained; execution, where the necessary tools are used to solve the problem; and continuous improvement, where the data and results will be explained and the effectiveness of the project will be demonstrated. Consequently, a pilot test was carried out in one of the projects of a company called ABC S.A. to collect information, data, and results related to the efficiency and the adoption level of the BIM for the purpose of validating the reduction of time taken for document processing, reduction of costs by 40%, and for its application in various companies of the same sector. The results showed that the digital transformation of document management reduced review time and improved worker performance.
AB - Currently, the lack of time and cost optimization in processes is a factor that affects 65% of companies in the construction sector as they continue to use traditional methods for several company processes, such as document processing. Therefore, the contribution of this research is the reduction of document approval time for the parties involved by 75% through the digital transformation of medium-sized companies in the construction sector using the building information modeling (BIM) methodology, applying three stages: planning, where the context of the company is analyzed and initial data are obtained; execution, where the necessary tools are used to solve the problem; and continuous improvement, where the data and results will be explained and the effectiveness of the project will be demonstrated. Consequently, a pilot test was carried out in one of the projects of a company called ABC S.A. to collect information, data, and results related to the efficiency and the adoption level of the BIM for the purpose of validating the reduction of time taken for document processing, reduction of costs by 40%, and for its application in various companies of the same sector. The results showed that the digital transformation of document management reduced review time and improved worker performance.
KW - BIM
KW - construction
KW - digital transformation
KW - document management
KW - reprocesses
UR - https://www.scopus.com/pages/publications/85084959581
U2 - 10.1109/ICITM48982.2020.9080390
DO - 10.1109/ICITM48982.2020.9080390
M3 - Contribución a la conferencia
AN - SCOPUS:85084959581
T3 - ICITM 2020 - 2020 9th International Conference on Industrial Technology and Management
SP - 1
EP - 5
BT - ICITM 2020 - 2020 9th International Conference on Industrial Technology and Management
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 9th International Conference on Industrial Technology and Management, ICITM 2020
Y2 - 11 February 2020 through 13 February 2020
ER -