T1 - Diseño y validación de un sistema redundante de respaldo de nitrógeno para sellos secos de compresores de gas en una refinería de petróleo
AU - Ayala-Vega, Diego
AU - Peña-Galvan, Edwin
AU - Velásquez-Costa, José
AU - Vilchez-Baca, Herbert
N1 - Publisher Copyright:
© 2026 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2026
Y1 - 2026
N2 - This paper presents the design of a nitrogen backup system for dry gas seals in the gas compressor of an FCC unit. The VDI 2221 methodology was applied to structure the design process from problem definition to the technical solution, incorporating the Deming cycle (PDCA) as a basis for future improvement. The theoretical calculation determined a total nitrogen volume of 23.8 m3 distributed in four accumulators of 5.95 m3 each, and MATLAB simulation confirmed that this volume is capable of supplying nitrogen to the dry gas seal for an estimated period of 8 hours in the event of a loss of the main supply. It was also identified that the system could prevent an unplanned shutdown of the FCC unit, evaluated using an indicator of USD 30,500 per hour of avoided downtime, and reduce the risk of damage to the dry gas seal, whose replacement cost may range between USD 40,000 and 70,000. Finally, the automatic and manual operating logic was defined for implementation in a Siemens S7-1200 PLC, allowing the activation of nitrogen backup in the event of a pressure drop and enabling recharge when the main line is restored, ensuring safe system switching.
AB - This paper presents the design of a nitrogen backup system for dry gas seals in the gas compressor of an FCC unit. The VDI 2221 methodology was applied to structure the design process from problem definition to the technical solution, incorporating the Deming cycle (PDCA) as a basis for future improvement. The theoretical calculation determined a total nitrogen volume of 23.8 m3 distributed in four accumulators of 5.95 m3 each, and MATLAB simulation confirmed that this volume is capable of supplying nitrogen to the dry gas seal for an estimated period of 8 hours in the event of a loss of the main supply. It was also identified that the system could prevent an unplanned shutdown of the FCC unit, evaluated using an indicator of USD 30,500 per hour of avoided downtime, and reduce the risk of damage to the dry gas seal, whose replacement cost may range between USD 40,000 and 70,000. Finally, the automatic and manual operating logic was defined for implementation in a Siemens S7-1200 PLC, allowing the activation of nitrogen backup in the event of a pressure drop and enabling recharge when the main line is restored, ensuring safe system switching.
KW - Deming cycle
KW - Dry gas seal
KW - FCC
KW - VDI 2221
KW - gas compressor
UR - https://www.scopus.com/pages/publications/105048871305
U2 - 10.18687/LACCEI2026.1.1.841
DO - 10.18687/LACCEI2026.1.1.841
M3 - Contribución a la conferencia
AN - SCOPUS:105048871305
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 24th LACCEI International Multi-Conference for Engineering, Education and Technology - Engineering without Borders
A2 - Petrie, Maria M. Larrondo
A2 - Texier, Jose
A2 - Matta, Rodolfo Andres Rivas
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 24th LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2026
Y2 - 16 June 2026 through 18 June 2026
ER -