TY - GEN
T1 - Enfoque basado en procesos y modelo SCOR para reducir los retrasos en la entrega de pedidos de un proveedor de equipos de mantenimiento para el transporte de minerales
AU - Salas-Loayza, Fernando
AU - Barboza-Miyoshi, Ricardo
AU - Salas-Castro, Rosa
AU - Chavez-Soriano, Pedro
AU - Ramos-Palomino, Edgar
AU - Macassi-Jáuregui, Iliana
N1 - Publisher Copyright:
© 2021 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2021
Y1 - 2021
N2 - This document presents the implementation of the SCOR and BPM model in a company that distributes equipment for the mining sector in Peru. Three levels of SCOR are used, the first two to identify the processes of the supply chain and the sub-processes of each of them, in the third level BPM is modeled and used where the processes are analyzed to detect the root cause of late delivery orders, generating the penalty payment. To reduce late orders, the processes and methods are redesigned. For the implementation, SCOR and BPM good practices are used for the development of the procedures, while the control and follow-up is done with the indicators that are also established in the SCOR model, expecting an improvement objective of up to 50% as proposed by other authors, so through simulation of improved processes it is obtained that result of order fulfillment is reduced by 3 weeks, achieving that orders delivered on time improve by 49% reaching objective proposed for this study.
AB - This document presents the implementation of the SCOR and BPM model in a company that distributes equipment for the mining sector in Peru. Three levels of SCOR are used, the first two to identify the processes of the supply chain and the sub-processes of each of them, in the third level BPM is modeled and used where the processes are analyzed to detect the root cause of late delivery orders, generating the penalty payment. To reduce late orders, the processes and methods are redesigned. For the implementation, SCOR and BPM good practices are used for the development of the procedures, while the control and follow-up is done with the indicators that are also established in the SCOR model, expecting an improvement objective of up to 50% as proposed by other authors, so through simulation of improved processes it is obtained that result of order fulfillment is reduced by 3 weeks, achieving that orders delivered on time improve by 49% reaching objective proposed for this study.
KW - BPM
KW - BPMN
KW - Mining maintenance supplier
KW - Order fulfillment
KW - Process redesign
KW - SCOR
UR - https://www.scopus.com/pages/publications/85122028828
U2 - 10.18687/LACCEI2021.1.1.505
DO - 10.18687/LACCEI2021.1.1.505
M3 - Contribución a la conferencia
AN - SCOPUS:85122028828
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - 19th LACCEI International Multi-Conference for Engineering, Education Caribbean Conference for Engineering and Technology
A2 - Larrondo Petrie, Maria M.
A2 - Zapata Rivera, Luis Felipe
A2 - Aranzazu-Suescun, Catalina
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 19th LACCEI International Multi-Conference for Engineering, Education Caribbean Conference for Engineering and Technology: "Prospective and Trends in Technology and Skills for Sustainable Social Development" and "Leveraging Emerging Technologies to Construct the Future", LACCEI 2021
Y2 - 19 July 2021 through 23 July 2021
ER -