TY - GEN
T1 - Improving Warehouse Management Processes to Ensure On-Time Delivery of Paprika-Based Products
AU - Concha-Rojas, Gabriel
AU - Macassi-Jauregui, Iliana
AU - León-Chavarri, Claudia
N1 - Publisher Copyright:
© 2023 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2023
Y1 - 2023
N2 - On-time deliveries are considered a strategic factor for the market positioning of companies. Such is the case of the company under study where only 76.5% of orders arrive on time, compared to 90.2% of companies in the same sector in Colombia. The causes of the problem are an inadequate management of the raw material warehouse processes, causes such as the lack of organization of the physical space that lengthen the preparation of orders, inefficient inventory control processes at the entrance and inside the warehouse and inadequate handling. These have caused losses of raw materials due to pyrolysis, shortages, and delays in production and therefore the rescheduling of the delivery date of orders. In order to improve these processes, we implemented the 5S and a redesign of the warehouse, simple sampling, ABC analysis, cyclic counting and EOQ model. As a result, an increase in orders delivered on time of 12.53% and an economic impact of $ 399,599 in a period of 5 years excluding implementation costs and a net cash flow in the first year of $ 9,810.
AB - On-time deliveries are considered a strategic factor for the market positioning of companies. Such is the case of the company under study where only 76.5% of orders arrive on time, compared to 90.2% of companies in the same sector in Colombia. The causes of the problem are an inadequate management of the raw material warehouse processes, causes such as the lack of organization of the physical space that lengthen the preparation of orders, inefficient inventory control processes at the entrance and inside the warehouse and inadequate handling. These have caused losses of raw materials due to pyrolysis, shortages, and delays in production and therefore the rescheduling of the delivery date of orders. In order to improve these processes, we implemented the 5S and a redesign of the warehouse, simple sampling, ABC analysis, cyclic counting and EOQ model. As a result, an increase in orders delivered on time of 12.53% and an economic impact of $ 399,599 in a period of 5 years excluding implementation costs and a net cash flow in the first year of $ 9,810.
KW - On-time deliveries
KW - paprika
KW - raw materials
KW - warehouse design
KW - warehouse management
UR - https://www.scopus.com/pages/publications/85172336002
M3 - Contribución a la conferencia
AN - SCOPUS:85172336002
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 21st LACCEI International Multi-Conference for Engineering, Education and Technology
A2 - Larrondo Petrie, Maria M.
A2 - Texier, Jose
A2 - Matta, Rodolfo Andres Rivas
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 21st LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2023
Y2 - 19 July 2023 through 21 July 2023
ER -