T1 - Lean Manufacturing Application Model to Reduce Order Delivery Delays in a Metalwork Company
AU - Y. Wong Herrera, Josiel
AU - J. Rodriguez Valdivia, Maria
AU - M. Castillo, Javier
AU - Nunura, César
N1 - Publisher Copyright:
© 2021 ACM.
PY - 2021/9/27
Y1 - 2021/9/27
N2 - This research was carried out in a metalwork company in Lima. It was identified that the main problem is the delay in order delivery, because 46.67% of these presented delays. The company expects to reduce this percentage by 15%. The analysis showed that there are excessive times in the setup of the machinery; in addition to the existence of objects scattered in the work area, it was found that the milling machine setup time is 46.6 minutes per batch, the travel time is 22.77 minutes per batch and that there are 8.9% of defective products of the total produced. A model of application of the Lean Manufacturing methodology was used to solve the problem, using the VSM, SMED and 5S tools, which were used to evaluate the current situation, formulate improvement proposals and then carry out their execution. Finally, Arena software was used to verify and validate the current situation as well as the improvement situation, in order to appreciate the effectiveness of the proposed methodology. It was obtained that the number of batches with delays was reduced by 50%, the setup time was reduced by 58.3% and the travel by 47%. In addition, the percentage of defective products was reduced to 4.91%.
AB - This research was carried out in a metalwork company in Lima. It was identified that the main problem is the delay in order delivery, because 46.67% of these presented delays. The company expects to reduce this percentage by 15%. The analysis showed that there are excessive times in the setup of the machinery; in addition to the existence of objects scattered in the work area, it was found that the milling machine setup time is 46.6 minutes per batch, the travel time is 22.77 minutes per batch and that there are 8.9% of defective products of the total produced. A model of application of the Lean Manufacturing methodology was used to solve the problem, using the VSM, SMED and 5S tools, which were used to evaluate the current situation, formulate improvement proposals and then carry out their execution. Finally, Arena software was used to verify and validate the current situation as well as the improvement situation, in order to appreciate the effectiveness of the proposed methodology. It was obtained that the number of batches with delays was reduced by 50%, the setup time was reduced by 58.3% and the travel by 47%. In addition, the percentage of defective products was reduced to 4.91%.
KW - 5S
KW - Delay in production
KW - Lean Manufacturing
KW - SMED
KW - VSM
UR - https://www.scopus.com/pages/publications/85123049252
U2 - 10.1145/3494583.3494623
DO - 10.1145/3494583.3494623
M3 - Contribución a la conferencia
AN - SCOPUS:85123049252
T3 - ACM International Conference Proceeding Series
SP - 300
EP - 307
BT - ICIBE 2021 - 2021 7th International Conference on Industrial and Business Engineering
PB - Association for Computing Machinery
T2 - 7th International Conference on Industrial and Business Engineering, ICIBE 2021
Y2 - 27 September 2021 through 29 September 2021
ER -