TY - GEN
T1 - Modelo para mejorar la red de distribución de energía mediante grupo electrógeno y apoyo con condensadores para satisfacer la demanda máxima en un asiento minero
AU - Alvarado-Laveriano, Walter
AU - Velasquez-Costa, José
AU - Vilchez-Baca, Herbert
N1 - Publisher Copyright:
© 2024 Latin American and Caribbean Consortium of Engineering Institutions. All rights reserved.
PY - 2024
Y1 - 2024
N2 - This research work describes a project to improve the electrical installations of a mining site in Peru due to energy shortage problems. The mining site is vital for the national production of silver, lead and zinc, which boosts the economy and generates employment. The lack of electricity supply affects ventilation in underground workings and other operations. The capacity of the existing generator sets does not cover the demand, and energy is rationalized, generating outages in the camp and other operational areas, affecting the quality of life of the collaborator. The improvement proposal consists of centralizing two generating sets in the same place, a main GE and an auxiliary one, an installation design is proposed that covers the sizing of the generating set to the power distribution, and applying reactive power compensation through capacitors. A model 3508TA generator set with a power of 680 KW is selected. The implementation of a 2.3kV medium voltage network is also proposed. The implementation of the model will be carried out considering safety regulations to preserve the health of the collaborator, the development of the activities of the mining site initially is at 35.6% after the implementation of the improvement model is calculated at an average of 84.5%, that is, there was an improvement of 48.9%. The validation of the project will be carried out using simulation software and specialized tools. In summary, the project seeks to solve the electricity supply problems in the mining site, improve operational efficiency and guarantee sustainable development in the future.
AB - This research work describes a project to improve the electrical installations of a mining site in Peru due to energy shortage problems. The mining site is vital for the national production of silver, lead and zinc, which boosts the economy and generates employment. The lack of electricity supply affects ventilation in underground workings and other operations. The capacity of the existing generator sets does not cover the demand, and energy is rationalized, generating outages in the camp and other operational areas, affecting the quality of life of the collaborator. The improvement proposal consists of centralizing two generating sets in the same place, a main GE and an auxiliary one, an installation design is proposed that covers the sizing of the generating set to the power distribution, and applying reactive power compensation through capacitors. A model 3508TA generator set with a power of 680 KW is selected. The implementation of a 2.3kV medium voltage network is also proposed. The implementation of the model will be carried out considering safety regulations to preserve the health of the collaborator, the development of the activities of the mining site initially is at 35.6% after the implementation of the improvement model is calculated at an average of 84.5%, that is, there was an improvement of 48.9%. The validation of the project will be carried out using simulation software and specialized tools. In summary, the project seeks to solve the electricity supply problems in the mining site, improve operational efficiency and guarantee sustainable development in the future.
KW - energy transmission
KW - Generator set
KW - maximum demand
KW - reactive power
KW - transformer
UR - https://www.scopus.com/pages/publications/85203836464
U2 - 10.18687/LACCEI2024.1.1.1227
DO - 10.18687/LACCEI2024.1.1.1227
M3 - Contribución a la conferencia
AN - SCOPUS:85203836464
T3 - Proceedings of the LACCEI international Multi-conference for Engineering, Education and Technology
BT - Proceedings of the 22nd LACCEI International Multi-Conference for Engineering, Education and Technology
PB - Latin American and Caribbean Consortium of Engineering Institutions
T2 - 22nd LACCEI International Multi-Conference for Engineering, Education and Technology, LACCEI 2024
Y2 - 17 July 2024 through 19 July 2024
ER -