TY - GEN
T1 - Optimization Model to Increase the Productive Flow, Applying SLP, 5s and Kanban-Conwip Hybrid System in Companies of the Metalworking Sector
AU - Diaz, David Enrique Apaza
AU - Garcia, Yeimy Salvatierra
AU - Santivanez, Grimaldo Quispe
AU - Castaneda, Elva
N1 - Publisher Copyright:
© 2022 IEEE.
PY - 2022
Y1 - 2022
N2 - The current demand of the metalworking sector has been increasing in recent years, causing competitive companies to constantly look for improving their productivity and effectiveness. The causes such as long distances between machines and lack of quality control in metalworking companies, causes unnecessary movements and at the same time an excess of product manufacturing time. To solve this problem, a hybrid model was developed that uses the SLP tools, 5s and the Kanban-Conwip hybrid system that, applied in the metalworking sector, allowed to reduce the unnecessary movements, optimize the use of the plant size and improve the relation between areas. Whose result could reduce 15.74% of unnecessary movements, which is equivalent to about 9.09 meters per day, resulting in an increase in productivity by 12.5%.
AB - The current demand of the metalworking sector has been increasing in recent years, causing competitive companies to constantly look for improving their productivity and effectiveness. The causes such as long distances between machines and lack of quality control in metalworking companies, causes unnecessary movements and at the same time an excess of product manufacturing time. To solve this problem, a hybrid model was developed that uses the SLP tools, 5s and the Kanban-Conwip hybrid system that, applied in the metalworking sector, allowed to reduce the unnecessary movements, optimize the use of the plant size and improve the relation between areas. Whose result could reduce 15.74% of unnecessary movements, which is equivalent to about 9.09 meters per day, resulting in an increase in productivity by 12.5%.
KW - 5s
KW - Kanban- Conwip Hybrid System
KW - Systematic Layout Planning (SLP)
KW - metalworking
KW - optimization
UR - https://www.scopus.com/pages/publications/85137020073
U2 - 10.1109/ICIM56520.2022.00041
DO - 10.1109/ICIM56520.2022.00041
M3 - Contribución a la conferencia
AN - SCOPUS:85137020073
T3 - Proceedings - 2022 8th International Conference on Information Management, ICIM 2022
SP - 186
EP - 190
BT - Proceedings - 2022 8th International Conference on Information Management, ICIM 2022
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 8th International Conference on Information Management, ICIM 2022
Y2 - 25 March 2022 through 27 March 2022
ER -