TY - GEN
T1 - Optimization of the Yellow Corn Cleaning Process with the Implementation of a Mechanical System
AU - Segura, Haru Helen Mallco
AU - Esteban, Yanira Malena Chavez
AU - Santana, Samir Genoary Rojas
AU - Costa, Jose Antonio Velasquez
N1 - Publisher Copyright:
© 2024 IEEE.
PY - 2024
Y1 - 2024
N2 - This work optimizes the yellow corn cleaning process through the implementation of a mechanical system in a company of the food sector, for which the production processes and customer requirements have been analyzed, based on the analysis of the time taking, the examination of each process with the Ishikawa diagram and through indicators in the Pareto diagram, decisions were made to improve their production times since initially there was a daily production of only 92.84 bags/day in a daily workday of 8 hours, with a minimum requirement of 400 bags/day. Finally, after evaluating the necessary requirements and the required production, a new corn cleaning machine was implemented, which was built and verified, the new production times, in which the productivity was improved by 357 %, managing to produce 424.53 bags/day in a workday of 8 hours a day, likewise it generates an improvement of 78.13% in the production process, on the other hand, the cleaning process has been reduced by 87.38%, being the activity that took the most time for the company, secondly, the times not only decreased in a specific area but in all the corresponding processes such as, in the process of receiving raw material, humidity control, verification of species, feeding to the corn well, weighing control, sack sewing and storage.
AB - This work optimizes the yellow corn cleaning process through the implementation of a mechanical system in a company of the food sector, for which the production processes and customer requirements have been analyzed, based on the analysis of the time taking, the examination of each process with the Ishikawa diagram and through indicators in the Pareto diagram, decisions were made to improve their production times since initially there was a daily production of only 92.84 bags/day in a daily workday of 8 hours, with a minimum requirement of 400 bags/day. Finally, after evaluating the necessary requirements and the required production, a new corn cleaning machine was implemented, which was built and verified, the new production times, in which the productivity was improved by 357 %, managing to produce 424.53 bags/day in a workday of 8 hours a day, likewise it generates an improvement of 78.13% in the production process, on the other hand, the cleaning process has been reduced by 87.38%, being the activity that took the most time for the company, secondly, the times not only decreased in a specific area but in all the corresponding processes such as, in the process of receiving raw material, humidity control, verification of species, feeding to the corn well, weighing control, sack sewing and storage.
KW - Hard Yellow Corn
KW - Ishikawa Diagram
KW - Mechanical System
KW - Optimization
KW - Pareto Diagram
KW - Pre-cleaning
KW - Time Taking
UR - https://www.scopus.com/pages/publications/85217080932
U2 - 10.1109/RCAE62637.2024.10834183
DO - 10.1109/RCAE62637.2024.10834183
M3 - Contribución a la conferencia
AN - SCOPUS:85217080932
T3 - 2024 7th International Conference on Robotics, Control and Automation Engineering, RCAE 2024
SP - 344
EP - 350
BT - 2024 7th International Conference on Robotics, Control and Automation Engineering, RCAE 2024
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 7th International Conference on Robotics, Control and Automation Engineering, RCAE 2024
Y2 - 25 October 2024 through 27 October 2024
ER -