TY - GEN
T1 - Prediction model by probabilistic methods for the evaluation of variables in underground mining pumping systems of variables in pumping systems in subway mining
AU - Peralta-Rodriguez, Paul
AU - Pena-Cajaleon, Jhonatan
AU - Pehovaz-Alvarez, Humberto
AU - Raymundo-Ibanez, Carlos
N1 - Publisher Copyright:
© 2023 IEEE.
PY - 2023
Y1 - 2023
N2 - Recurrent flooding in the mining works, deficiencies in the operation of pumps, unforeseen stoppages, and lack of water availability in the processes, affect the operations in the subway mine. The traditional solution adopted is to wait for maintenance times for its post evacuation, generating stoppages, consumption of water from the wells and inefficiency in the daily water demand. Therefore, this article presents a new approach that will expand the traditional methods by introducing a prediction model using probabilistic methods. This approach will allow the design of an optimal water distribution system, the efficient control in the maintenance and covering of the recirculated water demand inside the mine. Variables describing problems related to pump flow, pressure zoning and the type of pump distribution, either in series or in parallel in the pumping system, will be determined. Also, an average data of failure and maintenance times was collected and will be introduced to the '@risk' software where a comparison of three probabilistic methods will be generated.
AB - Recurrent flooding in the mining works, deficiencies in the operation of pumps, unforeseen stoppages, and lack of water availability in the processes, affect the operations in the subway mine. The traditional solution adopted is to wait for maintenance times for its post evacuation, generating stoppages, consumption of water from the wells and inefficiency in the daily water demand. Therefore, this article presents a new approach that will expand the traditional methods by introducing a prediction model using probabilistic methods. This approach will allow the design of an optimal water distribution system, the efficient control in the maintenance and covering of the recirculated water demand inside the mine. Variables describing problems related to pump flow, pressure zoning and the type of pump distribution, either in series or in parallel in the pumping system, will be determined. Also, an average data of failure and maintenance times was collected and will be introduced to the '@risk' software where a comparison of three probabilistic methods will be generated.
KW - probabilistic methods
KW - pumping system
KW - pumps
KW - subway mining
UR - https://www.scopus.com/pages/publications/85179555081
U2 - 10.1109/CONIITI61170.2023.10324154
DO - 10.1109/CONIITI61170.2023.10324154
M3 - Contribución a la conferencia
AN - SCOPUS:85179555081
T3 - 2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings
BT - 2023 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023 - Proceedings
A2 - Triana, Jenny Paola Hernandez
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 9th International Conference on Innovation and Trends in Engineering, CONIITI 2023
Y2 - 4 October 2023 through 6 October 2023
ER -