TY - JOUR
T1 - Production Management Model Based on Lean Manufacturing and Change Management Aimed at Reducing Order Fulfillment Times in Micro and Small Wooden Furniture Companies in Peru
AU - Castro-Chara, R.
AU - Valenzuela-Leandro, R.
AU - Chavez-Soriano, P.
AU - Raymundo-Ibañez, C.
AU - Dominguez, F.
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2020/4/6
Y1 - 2020/4/6
N2 - This research study seeks to identify and prioritize the causes of order fulfillment delays in a small wooden furniture manufacturing company. The authors propose a 5-phase Lean Optimization model to address and reduce this problem. Post-implementation results yielded a 54.87% reduction in material search and transportation times, a 32.86% reduction in travel times between stations, and a 19.81% increase in line efficiency. In addition, order fulfillment percentages increased from 12.5% to 60%.
AB - This research study seeks to identify and prioritize the causes of order fulfillment delays in a small wooden furniture manufacturing company. The authors propose a 5-phase Lean Optimization model to address and reduce this problem. Post-implementation results yielded a 54.87% reduction in material search and transportation times, a 32.86% reduction in travel times between stations, and a 19.81% increase in line efficiency. In addition, order fulfillment percentages increased from 12.5% to 60%.
UR - https://www.scopus.com/pages/publications/85083247531
U2 - 10.1088/1757-899X/796/1/012022
DO - 10.1088/1757-899X/796/1/012022
M3 - Artículo de la conferencia
AN - SCOPUS:85083247531
SN - 1757-8981
VL - 796
JO - IOP Conference Series: Materials Science and Engineering
JF - IOP Conference Series: Materials Science and Engineering
IS - 1
M1 - 012022
T2 - 9th Annual International Conference 2019 on Sciences and Engineering, AIC-SE 2019
Y2 - 18 September 2019 through 20 September 2019
ER -