TY - GEN
T1 - Proposal of Work Standardization to Improve a Metal-mechanical Process
AU - Casallo, L.
AU - Lucero, E.
AU - Maradiegue, F.
AU - Alvarez, J. C.
N1 - Publisher Copyright:
© 2021 IEEE.
PY - 2021
Y1 - 2021
N2 - The importance of offering quality products that meet customer requirements and expectations, and that are delivered on time has increased considerably, due to the high economic impact of late deliveries, which can cause penalties or even loss of customers. Therefore, delays in production processes are a problem that many manufacturing companies face, either due to poor distribution, disorder or lack of cleanliness in the workstations or lack of proper planning. This problem occurs frequently in the metal-mechanic sector of the country, due to the absence of controls to mitigate problems in the production lines. This research was applied in an SME of the metal-mechanic sector dedicated to the manufacture of parts for industrial mills. The tools used for the proposed solution is the standardization of work to reduce the current production time and improve the plant layout; and the application of material planning. The proposal achieves a reduction in product delivery time, which would avoid penalties and will have a better relationship with customers, increasing the company's profits by 45%.
AB - The importance of offering quality products that meet customer requirements and expectations, and that are delivered on time has increased considerably, due to the high economic impact of late deliveries, which can cause penalties or even loss of customers. Therefore, delays in production processes are a problem that many manufacturing companies face, either due to poor distribution, disorder or lack of cleanliness in the workstations or lack of proper planning. This problem occurs frequently in the metal-mechanic sector of the country, due to the absence of controls to mitigate problems in the production lines. This research was applied in an SME of the metal-mechanic sector dedicated to the manufacture of parts for industrial mills. The tools used for the proposed solution is the standardization of work to reduce the current production time and improve the plant layout; and the application of material planning. The proposal achieves a reduction in product delivery time, which would avoid penalties and will have a better relationship with customers, increasing the company's profits by 45%.
KW - Materials planning
KW - Process
KW - SLP
KW - Standardization work
UR - https://www.scopus.com/pages/publications/85125425133
U2 - 10.1109/IEEM50564.2021.9673052
DO - 10.1109/IEEM50564.2021.9673052
M3 - Contribución a la conferencia
AN - SCOPUS:85125425133
T3 - 2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021
SP - 668
EP - 672
BT - 2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021
Y2 - 13 December 2021 through 16 December 2021
ER -