T1 - ROAD CONSTRUCTION LABOR PERFORMANCE CONTROL USING PPC, PCR AND RNC DURING THE PANDEMIC
AU - De La Torre, Jorge R.
AU - Taboada, Luisa J.
AU - Picoy, Pool E.
N1 - Publisher Copyright:
© Prof. Luis F. Alarcón and Assoc. Prof. Vicente González, IGL2021 All rights reserved.
PY - 2021
Y1 - 2021
N2 - At the beginning of 2020, the Coronavirus pandemic had various countries negatively affected in the development of their economic activities, as their industries had to interrupt production, hindering their performance and economic development. Before this occurrence, it was known that the evolution of construction labor performance on site was minimum and had high indicators of variability. Due to this, extensive literature reviews have presented Last Planner® System as a methodology to mitigate and improve performance, mostly, in building construction. However, this deficiency presents itself with more frequency in road projects and worsens because of the pandemic. Having this said, it is important to control labor performance during the sanitary crisis in road projects. Therefore, in this context, the objective of this investigation is to validate the use of Last Planner® System methodology indicators (Percentage of Plan Completed and Percentage of Constraint Removal) as mechanisms of labor control. The findings evidence a direct relationship between improving indicators of Last Planner® System and a better labor performance while meeting budgeted yields.This in turn has validated the use of Last Planner indicators. Regarding the Reasons for non Completion, the impact of external factors merits and additional investigation due to frequency of occurrence.
AB - At the beginning of 2020, the Coronavirus pandemic had various countries negatively affected in the development of their economic activities, as their industries had to interrupt production, hindering their performance and economic development. Before this occurrence, it was known that the evolution of construction labor performance on site was minimum and had high indicators of variability. Due to this, extensive literature reviews have presented Last Planner® System as a methodology to mitigate and improve performance, mostly, in building construction. However, this deficiency presents itself with more frequency in road projects and worsens because of the pandemic. Having this said, it is important to control labor performance during the sanitary crisis in road projects. Therefore, in this context, the objective of this investigation is to validate the use of Last Planner® System methodology indicators (Percentage of Plan Completed and Percentage of Constraint Removal) as mechanisms of labor control. The findings evidence a direct relationship between improving indicators of Last Planner® System and a better labor performance while meeting budgeted yields.This in turn has validated the use of Last Planner indicators. Regarding the Reasons for non Completion, the impact of external factors merits and additional investigation due to frequency of occurrence.
KW - labor
KW - Last Planner® System
KW - lean construction
KW - performance
KW - variability
UR - https://www.scopus.com/pages/publications/85126222628
U2 - 10.24928/2021/0166
DO - 10.24928/2021/0166
M3 - Contribución a la conferencia
AN - SCOPUS:85126222628
T3 - IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges
SP - 747
EP - 756
BT - IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times
A2 - Alarcon, Luis Fernando
A2 - Gonzalez, Vicente A.
A2 - Murguia, Danny
A2 - Brioso, Xavier
PB - Department of Engineering, Civil Engineering Division, Pontificia Universidad Catolica del Peru
T2 - 29th Annual Conference of the International Group for Lean Construction, IGLC 2021
Y2 - 14 July 2021 through 17 July 2021
ER -