Times Optimization in the Installation of Loading Pipes in Underground Mining Operation

  • Rolling Sereno-Ricse
  • , Fernando Trinidad-Guerra
  • , Jorginho Hinostroza-Arias
  • , Jose Velasquez-Costa

Producción científica: Capítulo del libro/informe/acta de congresoContribución a la conferenciarevisión exhaustiva

Resumen

Economic policies and the crisis caused by COVID-19 have harmed mining production, with minimal, slow, and conservative investments. An alternative to improve this is underground mining, which represents 43% of worldwide operations; however, the limited production and the number of accidents are limiting, so the procedure for the optimization of times and the time of exposure of workers to danger during the installation of loading tubes were evaluated. For this, the current and improved PAD and POD were analyzed (after the modification of the bit and loading tube), evidencing that in the current procedure, it takes 91 minutes for the installation, with an advance of two and a half cycles. In contrast, in the improved situation, it takes 23 minutes, reaching three cycles, concluding that there is an optimization of 68 minutes per cycle. The time of exposure to danger is also reduced by 2.8 hours.

Idioma originalInglés
Título de la publicación alojadaIEEE Andescon, ANDESCON 2024 - Proceedings
EditorialInstitute of Electrical and Electronics Engineers Inc.
ISBN (versión digital)9798350355284
DOI
EstadoPublicada - 2024
Publicado de forma externa
Evento12th IEEE Andescon, ANDESCON 2024 - Cusco, Perú
Duración: 11 set. 202413 set. 2024

Serie de la publicación

NombreIEEE Andescon, ANDESCON 2024 - Proceedings

Conferencia

Conferencia12th IEEE Andescon, ANDESCON 2024
País/TerritorioPerú
CiudadCusco
Período11/09/2413/09/24

Huella

Profundice en los temas de investigación de 'Times Optimization in the Installation of Loading Pipes in Underground Mining Operation'. En conjunto forman una huella única.

Citar esto