Use of Data Acquisition Technologies to Optimize Construction Progress Monitoring Times in Residential Buildings

Marisol Aronés, Andrea Mendoza, Sandra Rodriguez, Humberto Ramirez

Producción científica: Capítulo del libro/informe/acta de congresoContribución a la conferenciarevisión exhaustiva

Resumen

The monitoring systems that are currently used as part of the management of construction projects consist of collecting the field information, documenting it manually and then digitizing it. Those responsible for carrying out the reports through this procedure dedicate between 28% and 41% of their time daily for their preparation. This traditional process is slow and inefficient because the information is dispersed in different documents, so data can be omitted, causing that no corrective actions are taken in a timely manner. Likewise, the construction sector has little use of technological resources, and therefore, there is no automated process, which makes it difficult to monitor construction projects in an efficient way. In this sense, this research establishes the optimization of the control procedure through the use of a data acquisition tool to reduce the man-hours used in advance control. With the application of this proposal, the hours spent by the personnel involved in project management were reduced by 30%.

Idioma originalInglés
Título de la publicación alojadaProceedings of the 5th Brazilian Technology Symposium - Emerging Trends, Issues, and Challenges in the Brazilian Technology
EditoresYuzo Iano, Rangel Arthur, Osamu Saotome, Guillermo Kemper, Reinaldo Padilha França
EditorialSpringer Science and Business Media Deutschland GmbH
Páginas605-615
Número de páginas11
ISBN (versión impresa)9783030575472
DOI
EstadoPublicada - 2021
Evento5th Brazilian Technology Symposium, BTSym 2019 - Campinas, Brasil
Duración: 22 oct. 201924 oct. 2019

Serie de la publicación

NombreSmart Innovation, Systems and Technologies
Volumen201
ISSN (versión impresa)2190-3018
ISSN (versión digital)2190-3026

Conferencia

Conferencia5th Brazilian Technology Symposium, BTSym 2019
País/TerritorioBrasil
CiudadCampinas
Período22/10/1924/10/19

Huella

Profundice en los temas de investigación de 'Use of Data Acquisition Technologies to Optimize Construction Progress Monitoring Times in Residential Buildings'. En conjunto forman una huella única.

Citar esto